Search

Integrated infrastructure

Modular & Edge Data Centers

Package racks, power, cooling and monitoring into a repeatable deployment for distributed or fast-track capacity.

Final design and equipment selection require project-specific engineering inputs.

Target outcome

A coordinated modular design with fewer equipment interfaces and a clearer delivery scope.

Why this is difficult

  • Small sites still require complete critical infrastructure.
  • Room constraints and deployment speed limit traditional construction.
  • Standardization must still accommodate local utility and climate conditions.

Engineering workstreams

What the solution must connect.

  1. 01Capacity and rack plan
  2. 02Integrated power and cooling
  3. 03Containment and enclosure
  4. 04Monitoring and security
  5. 05Site interface and delivery plan

Before we size equipment

Send these six design inputs.

If some values are not yet known, say so. The uncertainty itself becomes part of the engineering review.

Relevant product families

Equipment considered inside this architecture.

Vertiv SmartAisle 3

Modular Data Center

Vertiv SmartAisle 3

An integrated aisle-based data-center platform combining racks, power, cooling, containment and monitoring.

Project-configured aisle architecture
Review the series
Vertiv SmartCabinet

Modular Data Center

Vertiv SmartCabinet

A cabinet-level micro data-center approach that integrates IT enclosure, power, cooling and monitoring for distributed sites.

Configured for cabinet-level IT loads
Review the series

Request a project review

Turn your modular & edge data centers brief into a configuration path.

Our engineering team will turn the brief into a product shortlist, open technical questions and a quotation path.